AD Plant, EcoParc, Anglesey

  • Client

    Grays Biogas Limited

  • Project value


  • Services

    Geotechnical Engineering Structural Engineering Civil Engineering CDM Co-ordinator NEC3 Project Management Contract Administration Cost Management

  • Completion


Grays Biogas Ltd appointed Caulmert Limited to provide advice and design on a proposed AD Plant on Anglesey, North Wales. The scheme included the design of a reception and pre-processing building, general surrounding infrastructure as well as all ground investigation/ geotechnical aspects and earthworks balance modelling.

Design elements included the new line of access to the site; weighbridge and control room; drainage; reception/ pre-processing building including submission of Building Regulations package and slabs, bunds and tank foundations; large capacity bio filters; externals including apron, drainage and wash down areas; Containment bunds & walls.

Caulmert worked closely with the specialist process engineering consultant to develop an efficiant and cost effective civil engineering solution to meet the clients requirements.

Due to a change in feedstock for the AD Plant, the scheme will be revised accordingly and tendered in early 2015.