Recycling Storage Facility, Ipswich

  • Client

    Viridor Waste Management Ltd

  • Project value


  • Services

    Feasibility Study Structural Engineering Geotechnical Engineering Project Management

  • Completion


Caulmert was appointed by Viridor Waste Management Ltd to carry out a feasibility study and site investigation for a new recycling facility at their Ipswich Depot.

Due to increased site throughput, Viridor appointed Caulmert to look at the feasibility of constructing a new building onto their existing facility. Having taken the client requirements for the new facility, Caulmert carried out a review of the existing site. A structural assessment and analysis of the existing building was undertaken along with the ground investigation to compile a factual report. Caulmert carried out a Phase 1 Environmental Deskstudy, followed by a Phase 2 Site Investigation. Combined with a structural condition survey and an assessment of the existing concrete yard, a feasibility study was presented to Viridor in order to support their tender documentation for appointing a design and build contractor.

Back to Projects

Was great to see! @IoD_NorthWales #northwales

WantMature is a dating app, revealing flirty nature of its users still omitting texting.