LLEOLIAD Y SAFLE / SITE LOCATION
Datblygiad arfaethedig yng Nghronfa Ddŵr Llyn Celyn, Y Bala, LL23 7NY / Proposed development at Llyn Celyn Reservoir, Bala, LL23 7NY
DISGRIFIAD O’R DATBLYGIAD / DESCRIPTION OF DEVELOPMENT
Caniatâd cynllunio llawn ar gyfer adeiladu gorlifan ategol, sianel dal dŵr a siambr mesur llif o dan y ddaear, ailwampio’r maes parcio presennol a dargyfeirio cebl foltedd uchel o dan y ddaear, gan gynnwys mesurau lliniaru ecolegol ac i’r dirwedd, ynghyd â gwaith hwyluso gan gynnwys darparu ffyrdd cludo, ardaloedd storio/dadlwytho deunyddiau, gwelliannau i’r ffyrdd cyfagos, cyfleusterau gwaith a lles, a mannau parcio i gerbydau.
Full planning permission for the construction of an auxiliary spillway, catchwater channel and below ground flow measurement chamber, reconfiguration of the existing car park and the diversion of a below ground high voltage cable, including landscape and ecological mitigation measures, together with enabling works including the provision of haul roads, materials storage/set down areas, localised road improvements, site compound and welfare facilities and vehicle parking
Dogfennau Cais Cynllunio Drafft / Draft Planning Application Documents
Gwybodaeth Ategol / Supporting Information
- Scheme Description (dwyieithog/bilingual)
- Supporting Planning Statement
- Planning Application Form
- Design and Access Statement
- Site Waste Management Plan (SWMP)
- Material Management Plan (MMP)
- Construction Traffic Management Plan (CTMP)
- Flood Consequence Assessment
- Volume 1 – Environmental Statement
- Volume 2 – Technical Appendices
- EIA Screening Letter
- EIA Screening Response
- EIA Scoping Report
- EIA Scoping Response SNPA
- EIA Scoping Response NRW
- EIA Scoping Response CADW
- EIA Scoping Response GAT
- EIA Scoping Response WG
- Arboricultural Report
- Badger Report
- Bat Report
- Botanical Report
- Breeding Bird Report
- Dormice Report
- Habitats Regulations Appropriate Assessment
- Otter and Watervole Report
- Preliminary Ecological Appraisal Report
- Reptiles and GCN Report
- River Habitats Report
- Invertebrate Report
- Wintering Bird Report
- Heritage DBA
- Landscape Visualisations
- Viewpoint Photography
- Landscape and Environmental Management Plan (LEMP)
- Construction Environmental Management Plan
- Water Framework Directive Screening Assessment
- Water Framework Directive Scoping Assessment
- Volume 3 – Non-Technical Summary
Darluniau / Drawings
- Planning Application Site Boundary
- Site Location Plan
- Existing Site Plan
- Site General Arrangement
- Hesgyn Catchwater and Flow Measurement Structure
- Timber Post Stock Proof Fencing – Standard Detail
- Chain Single Leaf Field Gate – Standard Detail
- Tumble Bay General Arrangement
- Culvert General Arrangement
- Outlet General Arrangement
- Centre Alignment Long Section
- Tumble Bay Sections
- Culvert Sections
- Outlet Sections
- Enabling Works Plan
- Access Improvements Works
- Enabling Works – Site Compound – Plan View
- Landscape and Visual Considerations Plan 1
- Landscape and Visual – Landscape Plan
- Landscape and Visual Landscape Sections
- Extent of Archaeological Watching Brief
This consultation has now expired