We are pleased to announce that Caulmert have been appointed by a major waste contractor as designer, project manager and CDM-coordinator for the extension of an existing materials storage facility at one of the UK’s busiest Material Recycling Facilities.
The design works will include:
All construction levels,
Building foundations, foul drainage, surface water & building roof drainage,
All building fabric trims & connections,
Push walls,
Roof and elevations design,
Floor slab, protection to cladding, fire detection & alarm system, facility lighting,
Assessment and redevelopment of existing foul and surface water drains on the whole site.
Caulmert will be responsible for the design, contract documentation, tendering, project management, site supervision as well as CDM-coordinatation.